Bring the harbour, transport systems, materials industry and supporting infrastructure together through coordinated commissioning and operational handover. The work follows the physical journey through the programme: marine access, cargo handling, transport, receiving, processing, manufacturing and dispatch. Banking and pharmaceutical workstreams complete their own operating handovers in parallel. The phase consolidates equipment information, training, maintenance responsibilities and system interfaces so each team understands its own work and the connections it shares with others across the Enfidha programme. Integrated completion connects the enlarged harbour, high-tech industrial park, AVIS Towers and their shared infrastructure.
Scope of delivery
Coordinate equipment and systems commissioning across marine, terminal, transport, industrial and shared-service packages.
Complete operating procedures, training and handover records for the teams responsible for each functional area.
Exercise the interfaces between cargo movements, production, utilities, maintenance and programme information systems.
Consolidate milestone completion records and associated payment references through the programme’s delivery and AVISPay workflows.
What this phase hands over
Coordinated commissioning records connecting individual equipment acceptance with the operation of complete work packages.
Operating and maintenance information assigned to the teams responsible for the harbour and industrial systems.
Trained operating teams with defined interfaces, escalation routes and routine working procedures.
A programme handover register bringing together completed scope, system documentation and milestone-payment records.
Additional construction view · Milestone 12
The work behind the investment.
Integrated commissioning and operation. This large construction view develops the work package within the expanded harbour and AVIS industrial-park masterplan.
Milestone 12 · Integrated commissioning and operation · AVIS construction development
Construction payment 12 · 6%€150,000,000
AVIS-TN-12 Main construction investment including the harbour
Commission the programme around the way it will work. A vessel operation leads into cargo transfer, transport and receiving; a prepared material stream leads into processing, manufacturing and dispatch. These journeys reveal the interfaces that must work together beyond individual equipment tests.
Transfer knowledge with the asset
Operating teams need drawings, settings, equipment records, maintenance instructions and practical training together. Organise this information by the systems they will manage. The handover register assigns responsibility for each asset and preserves the connection between the completed installation and its supporting documentation.
Close each milestone coherently
Bring the delivery record, completion requirements and payment reference together for each milestone. The programme retains a clear history of what was delivered and which payment instruction relates to it. Further development, including the separate FreePort project, can then build from an organised operating foundation.
Execution logistics
Connect the work.
Schedule commissioning around the readiness of each connected system. Equipment, utilities and operators must be available in the appropriate sequence for meaningful integrated exercises. Coordinate trial cargo and material movements through designated routes, with the relevant terminal, logistics and production teams working to one plan.
Delivery interfaces
Milestone & handover
Completion milestone: integrated operating handover connects the delivered assets, responsible teams and programme records.
The phase combines completed terminal, transport, production and service packages into coordinated operations.