Design the harbour and industry as one connected system.
Enfidha construction & industry / Phase 02 of 12

Design the harbour and industry as one connected system.

Masterplan and engineering

AVIS architectural development design · Tunisia

02 / 12Construction milestone
€45mConstruction investment payment
1.8%Share of €2.5bn construction
AVISPayDirect-IP payment workspace
Work package 02

Masterplan and engineering

Develop an integrated plan for the Enfidha shoreline, marine works, industrial halls and transport connections. The plan gives the harbour a clear operating geometry while creating a recognisable AVIS architectural identity through sculpted structures, glass, planted terraces and robotic construction methods. Marine engineering, cargo handling and industrial production share one spatial model. The supplied port reference provides the starting design language for deep-water access and terminal scale; the engineering package translates that reference into coordinated work packages and detailed construction information. The expanded brief brings the twenty-times-larger harbour footprint, high-tech industrial park and AVIS Towers into one coordinated masterplan with common transport and utility corridors.

Scope of delivery

  1. Coordinate coastal, bathymetric, geotechnical and landside information within a common project model and drawing register.
  2. Develop the marine layout, terminal footprints, industrial plots and principal service corridors as connected design packages.
  3. Define the structural systems and fabrication approach for the futuristic AVIS buildings and their industrial operating spaces.
  4. Establish the equipment, vehicle, rail and pedestrian envelopes that determine clearances, access and maintainability.

What this phase hands over

  1. An integrated harbour and industry masterplan showing marine, production, transport and service interfaces.
  2. Coordinated design packages for the approach, basin, quays, industrial buildings and landside connections.
  3. A structural and architectural development system suitable for robotic fabrication and repeatable construction details.
  4. An interface register connecting dimensions, loads, utility demands and construction sequencing across the programme.
Additional construction view · Milestone 02

The work behind
the investment.

Masterplan and engineering. This large construction view develops the work package within the expanded harbour and AVIS industrial-park masterplan.

Milestone 02 · Masterplan and engineering · AVIS construction development
Construction payment 02 · 1.8%€45,000,000

AVIS-TN-02
Main construction investment including the harbour

Open this milestone in AVISPay
Detailed development programme

From design to delivery.

Marine reference geometry

The supplied reference design describes 19 metres of access depth, a 900-metre turning basin and five kilometres of quay frontage. Use these reference dimensions to organise the marine design studies and the relationship between vessel movements, berths and the landside terminal.

Industrial architecture

Shape the AVIS buildings around the processes they contain. Large clear production spaces, service galleries, roof maintenance and equipment replacement routes sit behind the sculpted exterior. Robotic printing and prefabricated components become part of the construction strategy, supported by repeatable connection details.

A model for phased delivery

Divide the masterplan into functional areas that can be engineered and delivered in a practical sequence. Show how each completed area connects to access, power, water and cargo routes. Preserve the interfaces to the separate FreePort development in the overall spatial plan.

Execution logistics

Connect the work.

Plan assembly yards, temporary access, heavy-lift positions and material storage alongside the permanent layout. Reserve continuous routes for future rail and major utilities before individual buildings occupy the available land. Design maintenance access into both the marine structures and the manufacturing halls.

Delivery interfaces

Milestone & handover

Engineering milestone: coordinated design information releases the next enabling and construction work packages.

Mobilisation provides the engineering briefs, survey commissions and delivery responsibilities for this phase.