Build the industry around the gateway.
AVIS Tunisia / Expanded harbour & industrial masterplan

Build the industry around the gateway.

High-tech industrial park

AVIS architectural development design · Tunisia

High-techAdvanced materials & manufacturing
AVIS TowersResearch & programme services
ConnectedHarbour · Rail · Roads
€2.5bnCombined construction programme
Expanded masterplan development

High-tech industrial park

A large industrial park connects the deep-sea harbour to advanced materials, robotic fabrication, laboratories, manufacturing and the AVIS Towers district. Freight routes and utility corridors organise the campus around the movement of equipment, qualified materials and finished products.

AVIS industrial-park development · Expanded Enfidha harbour masterplan
Detailed development programme

From design to delivery.

Organise the material chain

Connect receiving yards, identified material storage, preparation, nanopowder processing and quality control with the manufacturing halls. Plan controlled handover points between processes so materials move through a visible and coordinated industrial sequence.

Design around installation and maintenance

Provide clear routes for heavy equipment, manufacturing modules and building components from the harbour to their final positions. Include lifting zones, service access and equipment-replacement space in the hall layout and infrastructure corridors.

Make the campus work as one development

Coordinate the shared transport network with energy, water, communications, maintenance and people movement. The AVIS Towers form a connected district for research, engineering, leadership and programme services.

The industrial development districts

A complete high-tech
production environment.

Reception & recovery

Industrial cargo reception, sorting, preparation and controlled transfer into the material-recovery chain.

Milestone 08 →

Nanopowder & laboratories

Processing equipment, qualified feedstocks, analytical work and controlled production interfaces.

Milestone 09 →

Robotic printing & fabrication

Large construction printers, robotic production cells, component assembly and industrial finishing.

Milestone 10 →

Freight & distribution

Rail, roads, cargo-transfer yards and the industrial connections to the deep-sea harbour.

Milestone 07 →

Campus infrastructure

Energy, water, digital connections, maintenance systems and the infrastructure of daily operations.

Milestone 11 →
Industrial construction payment connections

Fund the work
through its milestone.

The industrial work packages use their existing references within the €2.5 billion construction programme.

A vertical centre for the campus

The AVIS
Towers district.

Sculptural printed structures and planted public spaces connect the people directing, developing and operating the industrial programme.

Research, engineering, finance and workforce services share the same campus and the same transport and utility network.

Explore the AVIS Towers →
AVIS TUNISIA · ARCHITECTURAL GALLERY