01Programme mobilisation
Open the programme and coordinate its first engineering and acquisition work.


A harbour masterplan expanded to 20 times the previous footprint. AVIS Towers and a high-tech industrial park. €2.5 billion of main construction investment across twelve milestone payments.
AVIS architectural development design · Tunisia
The harbour is the gateway. The industry creates the next use for the materials moving through it.
AVIS brings deep-water port construction, material recovery and advanced manufacturing into a connected programme. The architecture follows our sculptural, 3D-printed design language, adapted to the Tunisian coast and its transport networks.
Bank infrastructure supports the GENESIS Green Bond and construction payments. PERLAMED provides the pharmaceutical development platform for NoAge. Each has its own work package within the wider programme.
Explore the twelve construction milestones →Protected marine access, container and multipurpose quays, efficient cargo transfer and inland transport connections form the harbour’s development brief.
The programme links that gateway to high-technology industry and the wider Pan-African and Arab merchant transport network.
Explore the terminal programme →Explore the enlarged masterplan, the three harbour construction-completion stages and the high-tech industrial park with its tower district and shared infrastructure.

A harbour on a new scale.
Explore the development →
Build the industry around the gateway.
Explore the development →
The vertical centre of a connected industrial city.
Explore the development →Explore the construction images, scope and development plan for every phase. Each investment payment follows the twelve-part milestone schedule and opens directly in AVISPay.
12 of 12 construction milestones
01Open the programme and coordinate its first engineering and acquisition work.
02Connect marine works, industry, transport and services in one delivery design.
03Prepare the ground, access corridors and services for construction.
04Create vessel access, turning space and the foundations of the harbour.
05Build protected waters, working quays and the marine interface.
06Equip container and multipurpose berths for coordinated cargo handling.
07Connect ships, freight rail, trucks and regional logistics.
08Receive, identify, prepare and route materials into the industrial process.
09Refine prepared fractions into qualified nanopowder feedstocks.
10Use advanced materials for robotic printing and industrial fabrication.
11Provide power, water and the services of a working industrial campus.
12Bring the harbour, industry and support systems into coordinated operation.
The main construction investment includes the Enfidha harbour and advanced-industry works. Each milestone carries its amount, share and dedicated reference into AVISPay’s direct-IP payment workspace.
| Phase | Construction work package | Investment payment | Share | Cumulative allocation | Payment workspace |
|---|---|---|---|---|---|
| 01 | Programme mobilisationAVIS-TN-01 | €5,000,000 | 0.2% | €5,000,000 | Open in AVISPay |
| 02 | Masterplan and engineeringAVIS-TN-02 | €45,000,000 | 1.8% | €50,000,000 | Open in AVISPay |
| 03 | Site access and enabling infrastructureAVIS-TN-03 | €100,000,000 | 4% | €150,000,000 | Open in AVISPay |
| 04 | Dredging and marine foundationsAVIS-TN-04 | €200,000,000 | 8% | €350,000,000 | Open in AVISPay |
| 05 | Breakwaters and quay structuresAVIS-TN-05 | €300,000,000 | 12% | €650,000,000 | Open in AVISPay |
| 06 | Terminals and cargo handlingAVIS-TN-06 | €350,000,000 | 14% | €1,000,000,000 | Open in AVISPay |
| 07 | Rail road and airport interfacesAVIS-TN-07 | €300,000,000 | 12% | €1,300,000,000 | Open in AVISPay |
| 08 | Material reception and recoveryAVIS-TN-08 | €250,000,000 | 10% | €1,550,000,000 | Open in AVISPay |
| 09 | Nanopowder processing and qualificationAVIS-TN-09 | €300,000,000 | 12% | €1,850,000,000 | Open in AVISPay |
| 10 | Robotic 3D printing and manufacturingAVIS-TN-10 | €250,000,000 | 10% | €2,100,000,000 | Open in AVISPay |
| 11 | Energy water and campus servicesAVIS-TN-11 | €250,000,000 | 10% | €2,350,000,000 | Open in AVISPay |
| 12 | Integrated commissioning and operationAVIS-TN-12 | €150,000,000 | 6% | €2,500,000,000 | Open in AVISPay |
| Total construction investment | €2,500,000,000 | 100% | €2,500,000,000 | 12 milestones | |
These four packages add €58 million to the main €2.5 billion construction investment, which includes the harbour and advanced-industry works.

Programme office, engineering mobilisation and initial project development.
Open in AVISPay View the work package
Acquire the bank infrastructure serving bond custody and programme payments.
Open in AVISPay View the work package
Acquire the PERLAMED pharmaceutical industry platform.
Open in AVISPay View the work package
Add industrial equipment and laboratories for the NoAge manufacturing programme.
Open in AVISPay View the work package€2,558,000,000Main construction investment including the harbour, plus the four additional allocations.
Prepare the bank’s working environment, technology infrastructure, custody operations and connection to AVISPay as a dedicated work package.
Open refurbishment in AVISPay View the bank development scopeThe capital increase is calculated in AVISPay from the bank’s existing capital position to the target level, with its own payment reference.
Open capital increase in AVISPay View the capital programmeBank refurbishment and the capital increase follow their own financial scope. The additional FreePort is a separate project →
A purpose-built industrial chain connects waste reception to nanopowder preparation and the manufacture of new products.
The development brings together material identification, sorting, preparation, VORTEX processing, separation, laboratory qualification and controlled feedstock delivery. Robotic 3D printing turns those qualified materials into components, structures and industrial products.
Explore robotic manufacturing →The harbour, transport and manufacturing work packages meet at defined physical interfaces.
Connect berth operations to cargo handling, rail sidings, road access and regional distribution.
Move identified material through preparation, nanopowder production, quality control and robotic fabrication.
Coordinate power, water, maintenance, workforce services and the financial infrastructure supporting delivery.
The pharmaceutical acquisition and equipment programme prepares the facility for the intended nano-medical and peptide-product manufacturing workstream.
The new architecture develops the actual host building’s form, with a dedicated refurbishment, industrial equipment and laboratory programme.
The bank programme connects the GENESIS Green Bond to the operating needs of a major construction and industrial development.
Acquisition, refurbishment, capitalisation and AVISPay integration form distinct work packages, with payment instructions linked to their programme references.
A distinct programme for industrial logistics, merchant activity and connected manufacturing, serving the Pan-African and Arab transport network.
Its development scope, milestones and financial structure are organised as an additional project alongside the harbour programme.
Explore the additional FreePort project →Programme leadership, masterplan, engineering, site access and enabling services.
Dredging, marine structures, terminals and freight transport connections.
Material reception, nanopowder preparation and robotic manufacturing.
Campus services, operational preparation and coordinated commissioning.
The revised architectural masterplan expands the earlier harbour footprint twentyfold and connects it with the AVIS Towers, high-tech industrial park and shared infrastructure.