Connect the harbour to the regional transport network.
Enfidha construction & industry / Phase 07 of 12

Connect the harbour to the regional transport network.

Rail road and airport interfaces

AVIS architectural development design · Tunisia

07 / 12Construction milestone
€300mConstruction investment payment
12%Share of €2.5bn construction
AVISPayDirect-IP payment workspace
Work package 07

Rail road and airport interfaces

Build the transport interfaces that make the harbour a useful gateway between maritime routes, Tunisian industry and wider African and Mediterranean markets. Rail sidings, truck circulation and cargo-transfer facilities connect the terminals with the industrial centre. The Enfidha-Hammamet airport link forms part of the supplied multimodal development concept for time-sensitive freight. This phase concentrates on coherent routes, cargo handling and operational coordination so each transport mode supports the overall journey from ship to production, storage or onward distribution.

Scope of delivery

  1. Develop freight rail interfaces, sidings and transfer areas around the terminal and industrial operating requirements.
  2. Construct truck entrances, internal roads, waiting areas and loading routes with clear traffic separation.
  3. Organise the cargo and information interfaces supporting airport-linked logistics and time-sensitive industrial consignments.
  4. Connect transport operations with terminal dispatch, industrial reception and the maintenance of vehicles and handling equipment.

What this phase hands over

  1. Defined freight routes linking marine terminals, industrial halls, cargo-transfer areas and the external network.
  2. Rail and road interfaces with the civil, equipment and service provisions needed for their operating functions.
  3. Cargo-transfer procedures coordinating dispatch, receiving windows, handling requirements and shipment identification.
  4. A transport-interface register covering shared crossings, access responsibilities and maintenance arrangements.
Additional construction view · Milestone 07

The work behind
the investment.

Rail road and airport interfaces. This large construction view develops the work package within the expanded harbour and AVIS industrial-park masterplan.

Milestone 07 · Rail road and airport interfaces · AVIS construction development
Construction payment 07 · 12%€300,000,000

AVIS-TN-07
Main construction investment including the harbour

Open this milestone in AVISPay
Detailed development programme

From design to delivery.

A continuous cargo journey

Design the connections around actual movements: a container from quay to train, a manufacturing module from ship to assembly hall, or a time-sensitive consignment to air cargo. Each transfer needs space, equipment, identification and responsibility at both ends of the interface.

Road and rail without conflict

Freight operations work best when crossings and waiting areas are planned as part of the system. Separate pedestrian access from heavy vehicles and define the interaction between trucks and rail. Provide maintenance access that does not depend on occupying the main cargo routes.

Industrial and regional distribution

Connect the port’s transport system with the production campus and its dispatch requirements. Finished components, qualified materials and pharmaceutical consignments have different handling needs. The logistics plan assigns suitable transfer routes and operating procedures while preserving the programme’s common shipment references.

Execution logistics

Connect the work.

Protect freight corridors during building and terminal construction. Sequence rail installation, road surfacing and service crossings so completed infrastructure remains accessible. Plan the movement of oversized manufacturing equipment through the same network, including turning space, load limits and lifting interfaces at its destination.

Delivery interfaces

Milestone & handover

Transport milestone: usable intermodal routes connect terminal activity with industrial reception and regional distribution.

Enabling infrastructure and the terminal structural layout establish the corridors and transfer points used by this phase.

AVIS TUNISIA · ARCHITECTURAL GALLERY