The Enfidha programme brings a deep-water harbour, advanced materials production and robotic manufacturing into one coordinated delivery plan. Mobilisation establishes the people, surveys, engineering packages and site arrangements needed to move from the project brief into ordered execution. Construction milestone 01 carries a €5 million allocation within the €2.5 billion construction schedule. The additional €5 million kickoff package is a separate payment with its own reference. Banking and pharmaceutical acquisitions begin as connected supporting programmes, each with its own scope and payment record. The separate FreePort development is presented alongside the harbour programme through its own project page.
Scope of delivery
Establish the programme office, technical leads and work-package responsibilities for marine construction, industrial systems and supporting acquisitions.
Prepare the first engineering commissions, survey briefs, site-access arrangements and document-control structure.
Organise the early bank and pharmaceutical acquisition workstreams around the intended operating requirements of the wider programme.
Link construction milestone 01 (€5 million) and the additional kickoff package (€5 million) to their separate AVISPay payment references.
What this phase hands over
A coordinated delivery register identifying each work package, its lead and the interfaces it must resolve.
Survey and design briefs covering the harbour, industrial campus, transport connections and site services.
A mobilisation schedule connecting the first engineering activities with acquisition and operational-preparation work.
Separate construction-milestone and additional-kickoff payment records carrying their own references, amounts, currencies and processing histories.
Additional construction view · Milestone 01
The work behind the investment.
Programme mobilisation. This large construction view develops the work package within the expanded harbour and AVIS industrial-park masterplan.
Milestone 01 · Programme mobilisation · AVIS construction development
Construction payment 01 · 0.2%€5,000,000
AVIS-TN-01 Main construction investment including the harbour
Organise the harbour and industrial centre around their physical connections: vessel access, cargo transfer, material reception, processing and manufacturing. The programme office maintains the interface register so a change to one package is carried through to affected utilities, roads and equipment layouts.
Early acquisition coordination
Bring the bank and pharmaceutical workstreams into mobilisation from the outset. The bank supports bond custody and construction-payment services; the pharmaceutical facility supports the NoAge manufacturing development programme. Acquisition teams define their handover inventories and integration requirements alongside the construction leads.
Payment and delivery records
Give each programme package a stable reference shared by its presentation page, delivery register and AVISPay instruction. Construction milestone 01 and the additional kickoff allocation have separate references and appear once each in the financial schedule. Their work scope and payment history remain associated as the programme develops.
Execution logistics
Connect the work.
Use a shared programme calendar for engineering visits, survey teams, acquisition inspections and local site coordination. Establish practical routes for personnel, survey equipment and early temporary facilities before heavier construction movements begin. Keep marine and landside mobilisation responsibilities visible in the same delivery sequence.
Delivery interfaces
Milestone & handover
Construction milestone 01: programme mobilisation and coordinated engineering work. The additional kickoff package is recorded separately.
This opening phase establishes the delivery framework used by every subsequent phase.
Additional programme allocation
A dedicated €5 million kickoff.
Launch the programme office, early project development and the coordination of the acquisition workstreams.
This additional allocation has its own AVIS-TN-KICKOFF reference. It is added to the €2.5 billion construction schedule, whose first €5 million tranche carries the separate AVIS-TN-01 reference.