VORTEX production & powder refinement
Develop the owner’s 500-VORTEX-mill programme through modular production wings in the large waste-processing halls. The 250 × 250 m principal hall is a design requirement; equipment spacing, service corridors and module allocation are determined by coordinated engineering. Each commissioned line must connect qualified feedstock to measurable powder specifications.
Scope of delivery
- Develop a coordinated equipment register for the programme of 500 VORTEX mills
- Engineer modular process wings, separation, filtration and powder transfer
- Size compressed-air, electrical and material-handling services from vendor data
- Commission modules progressively using Sarno qualification evidence
What this phase hands over
- Factory and site acceptance records
- Measured throughput and energy performance by feedstock
- Particle-size, composition and contamination data
- Batch release and traceability system
Part of the active programme
The programme began in 2005 and continues through 2026 with ongoing development activity and expenditure. Its former waste-to-petrol route will not be executed. The current programme develops waste-to-nanopowder, advanced manufacturing, alternative-energy systems and the supporting campus infrastructure.
Programme expenditure is covered by the GENESIS Green Bond.
The project is now moving onto the AVIS platform to bring industrial companies, engineering teams and universities into coordinated delivery packages. Participants contribute manufacturing capability, engineering, research, testing and training through defined scopes and interfaces.