AVIS AVIS coastal masterplan — photorealistic development visualization
Construction & Engineering / Phase 02 of 12

One campus. One coordinated plan.

Masterplan & delivery engineering

Explore this phase ↓
AI-generated architectural development visualization based on AVIS.Land and supplied AVIS designs.
€45,000,000Phase allocation
Progressive deliveryPackage execution
02 / 12Delivery sequence
EURTranche currency
Sarno + coastal site

Masterplan & delivery engineering

Translate the 100-hectare coastal ambition into a coordinated industrial, energy and living campus. Resolve the land boundary, access, utilities and engineering interfaces while Sarno develops the technical evidence.

Scope of delivery

  1. Complete surveys, ground investigations and site-selection due diligence
  2. Develop the campus masterplan, utility corridors and separated traffic routes
  3. Prepare phased design packages, cost controls and authority submissions
  4. Establish the project data room, procurement packages and interface register

What this phase hands over

  1. Site boundary and survey package
  2. Coordinated masterplan and design basis
  3. Baseline programme, package budgets and risk register
  4. Approved issue-for-procurement package list

Part of the active programme

The programme began in 2005 and continues through 2026 with ongoing development activity and expenditure. Its former waste-to-petrol route will not be executed. The current programme develops waste-to-nanopowder, advanced manufacturing, alternative-energy systems and the supporting campus infrastructure.

Programme expenditure is covered by the GENESIS Green Bond.

The project is now moving onto the AVIS platform to bring industrial companies, engineering teams and universities into coordinated delivery packages. Participants contribute manufacturing capability, engineering, research, testing and training through defined scopes and interfaces.

Execution logistics

Move with a plan.

Control every design revision in a common data environment. Confirm the coastal parcel and access route before booking abnormal-load transport or allocating permanent buildings.

Completion & payment milestone

Owner accepts the design basis and site strategy; the required land rights and authorisations are recorded before physical works are released.

Delivery responsibility: Programme director · masterplanner · lead engineer.
Predecessor phases: Programme mobilisation.
The programme is already underway. Package dates and progress follow the current execution register; no new project start is implied.

Detailed development brief

Engineering the AVIS industrial city.

A coordinated industrial city

Organise the onshore 100-hectare brief around the waste-processing core, energy and compressed-air services, robotic manufacturing, research and the living campus. The large harbour, water areas and marine works require a separately defined boundary connected to this land plan.

AVIS architectural identity

Use the supplied multi-lobed glass process envelope, planted spiral towers and connected waterfront buildings as the design language. Structural systems, façade maintenance, acoustic separation and fire compartments must be coordinated behind that visual identity.

Programme control

The €2.5 billion total remains the overall funding envelope. Maintain incurred, committed and remaining cost columns for all twelve packages, with GENESIS Green Bond coverage recorded as the sponsor’s financing basis. Partner commitments are registered against defined work packages.

Supplied AVIS architecture and engineering reference
Supplied AVIS reference: drawing-3-1.webp. Earlier Motril / international designs inform the Italian programme; this is not an approved Italian construction drawing.
Construction interfaces

From the harbour to the process hall.

The owner’s design brief combines principal 250 × 250 metre processing halls, a programme of 500 VORTEX mills, robotic kinetic-fusion printing and heavy maritime, rail and truck logistics.

PRINCIPAL HALL • 250 × 250 mModule 0125 unitsModule 0225 unitsModule 0325 unitsModule 0425 unitsModule 0525 unitsModule 0625 unitsModule 0725 unitsModule 0825 unitsModule 0925 unitsModule 1025 unitsModule 1125 unitsModule 1225 unitsModule 1325 unitsModule 1425 unitsModule 1525 unitsModule 1625 unitsModule 1725 unitsModule 1825 unitsModule 1925 unitsModule 2025 units62,500 m² envelope • 20 illustrative modules × 25 mills = 500Module arrangement is conceptual; equipment fit and clearances are not verified.LARGE HARBOUR + SHIPPINGHEAVY RAIL + TRUCK RECEIVINGSORTING → MILLING → POWDERROBOTIC PRINTING + PLATFORMSPhase 02 interface study • not a construction drawingWater areas and marine works are outside this hall schematic.

Engineering work package

Confirm structural grids, equipment foundations, loading paths, service capacities and maintainable access. Validate the mill count and production configuration through the equipment register and vendor drawings.

Marine and transport interfaces

Coordinate harbour works, shipbuilding and heavy platforms with rail access and truck circulation. This is a planning diagram, not a surveyed layout or approved engineering drawing.

Original AVIS construction referenceAVIS source construction reference

18012026390810ProjectSumary.pdf, page 34. International reference design; source dimensions and capacities are not automatically adopted for the Italian site.

AVIS architectural identity

The development, visualised.

Photorealistic views connect this work package to the waste facility, maritime industry and wider campus. Select an image to inspect it.

Original document images — design references

These original source illustrations are retained for traceability; they are not site photographs.

Source and scope notes

D1 pp1–2; D3 pp3,17,20; current owner brief. D1: The projectDev; D2: Italian Prototyping Nanopowder from Waste Project; D3: Project Description. The phase breakdown, milestones and budget allocation are newly proposed for the owner’s current brief.

The coastal parcel is described by the owner as approximately 30 km south of Salerno. Exact boundaries, site control and construction authorisations are not established by the supplied documents. Concept imagery from other AVIS programmes illustrates the design language only.