Greece - Alexandria
Greece

The Greece team entered into negotiations with the Alexandria municipality, Thessaloniki waste authorities, Athens, Thessalia prefecture, province authorities from Thrace, and Piraeus waste collection authorities for solving the existing environment problems from the open field waste for their population. Agreement has been reached to erect the same green energy park at Alexandria, Thessaloniki, Athens, Thessaly, Thrace, and Piraeus.
Alexandria, Central Macedonia, city of Alexandria, City of Veroia, City of Naousa, city of Katerini, 350,000 peoples. Quantity of annual waste 300,000 MT. The Green Energy Industrial Park construction will cost €275M.
Thessaloniki, Central Macedonia, 1,200,000 peoples. Quantity of annual waste 850,000 MT. The Green Energy Industrial Park construction will cost €500.0M. Athens, province of Athens, 4,500,000 peoples. Quantity of annual waste, 4,000,000 MT per year. The Green Energy Industrial Park construction will cost 3 x €250.
Province of Thessaly, city of Larissa, city of Volos, City of Trikala, city of Karditsa, 450,000 peoples. Quantity of annual waste ca 350,000 MT. The Green Energy Industrial Park construction will cost €250M.
30 Ha high-tech glass greenhouse with solar panels, the installation will consist of a cooperation of a combined heat and power station. With a total capacity of producing 50 MWel and with synthetic diesel production of 8 reactor tubes each 2,000 l each hour utilizing the AVIS BML catalytic de polymerization conversion process of unsorted municipal waste to 350,000 MT per year.
1000 MT each year organic grown fish production unit and a zero energy input building for packing vegetables and fish. Thomas Ferfyris and his team taking care on coordinate the technology assembling of the green energy parks.
