Bridge engineering
40 m long × 10 m wide. Vertically travelling bridge. Suspended robot carriers underneath. Five deposition heads at the end of every robotic arm. 22 bridge bays along the 220 m facility.
The 520-arm fleet allocation across bridges is subject to the detailed engineering layout; no unsupported per-bridge count is imposed.