AVIS • Industrial Engineering • Page 19 / 28

Milestone Payments

Ten construction milestone payments of €70 each, €700 in total.

Milestone Payments
Payment 01

€70

Floating base and buoyancy structure

Reference: AVIS-KF-M01

Select payment
Payment 02

€70

Longitudinal frame and 40 m production span

Reference: AVIS-KF-M02

Select payment
Payment 03

€70

Twenty-two 40 × 10 m movable bridges

Reference: AVIS-KF-M03

Select payment
Payment 04

€70

Vertical guides, lifts and bridge controls

Reference: AVIS-KF-M04

Select payment
Payment 05

€70

520 suspended robotic arms and five-head assemblies

Reference: AVIS-KF-M05

Select payment
Payment 06

€70

Nanopowder waste conversion and material feed

Reference: AVIS-KF-M06

Select payment
Payment 07

€70

Kinetic fusion deposition and optical monitoring

Reference: AVIS-KF-M07

Select payment
Payment 08

€70

AI command, laboratories and quality systems

Reference: AVIS-KF-M08

Select payment
Payment 09

€70

Bionic hull and floor-by-floor construction commissioning

Reference: AVIS-KF-M09

Select payment
Payment 10

€70

Harbour integration, acceptance and final handover

Reference: AVIS-KF-M10

Select payment

Total: €700