Description

AVIS GLOBAL GREEN ENERGY INDUSTRIAL PARK

The construction of such a mega industrial park has never been done before, anywhere in the world, by anyone.
The AVIS project is a long-standing concept developed over a 17-year period. Worldwide AVIS team members and franchisees are pursuing a very complicated concept of combining technologies under a massive graphene-carbon dome as a high-tech centre. The installed equipment processes all types of waste into nanopowder. A sustainable overall solution for the cities' environment.
To date, nearly 200 constructions have been agreed around the world.

In 2022, the final phase of the project will be launched by merging and acquiring several VIP construction companies to build at least 10 high-tech centres with green city infrastructure per year. To meet the massive financial needs, the AVIS Group has developed a unique financial model, managed by the AVIS QUANTUM Bank.



INPUT MATERIALOUTPUT PRODUCTS
Municipal, toxic and industrial waste unsorted Capacity:
up to 10,000,000 tons/year
Recyclable Capacity: 6,000,000 tons/year
Biomass Capacity:  4,000,000 tons/year
18,000,000 MT Nano Powder                                     
1000MW electric power 
25,000 tons/year alternative meat
5,000 tons/year fish (organic) 

PHASE 1

Usual processing development Adapting of exiting Industrial Infrastructure (if any) for manufacture of required equipment products, Graphene research and industrial production and VORTEX Nano Powder mills 3D printing in graphene and titanium. University installation together with https://www.hanyang.ac.kr/web/... 

and

production of 3different types of generators for the generation of free electricity. 3D printer valuation test department with TITOMIC and prototyping production centre including robot printer test centre. General generation of green energy technology research centre units. Adapting the exiting harbour infrastructure for the discharge of rubbish import up to 20'0000'000 metric tons. 

and

Installing of 250, *15 MT-Vortex mill-units for the waste conversion into 3D Nano Powder. 

and

Installing 100, 3D Printer processing units for Industrial Products. PHASE 2 5 Units 10.0 Ha ‘’State of the Art’’ high teach tropical glass greenhouse and the Installation in cooperation with a Combined Heat & Cooling Power station. 

and 

2500 Mt organic fish production unit 

and 

a zero-energy input building for packing vegetables and fish. 

and 

2GW electro generators technology – Hydrogen Magnetic Dynamo. 

and  

PHASE 2

Start TAX Free Zone Corporate Register. 

and  

Start Large Shipp Register. 

and  

Start Bank Quantum Server Centre. 

Waste Conversion Capacity: >20.000.000 metric tons (phase I plus phase II) 

PHASE 3 

3D Paradise City Construction for 500.000 to 1.000.000 peoples

Attachments

Country Introduction (Country_Intro_World2022Q3.pdf, 13,308 Kb) [Download]

Short Web Presentation (AVIS_Project2023-08Introduction.pdf, 3,464 Kb) [Download]

The Reference AVIS City Project (06022021320307PreProjectWeb_ii_.pdf, 7,985 Kb) [Download]

Factory Planning (32482015ChecklistforyFactoryPlanning.pdf, 1,073 Kb) [Download]

Waste Keys (01012019390401WasteKeys.pdf, 189 Kb) [Download]

Reviews

No reviews found