Existing AVIS bionic tower vision with landscaped architecture and green industrial infrastructure AVIS architectural and industrial vision

Print and construct

The architecture of a productive city.

The AVIS Towers give the park its identity. Their bionic geometry is part of a wider working environment supported by energy, water, data, environmental systems and public infrastructure.

Connect the buildings to the systems that sustain them

Energy and water infrastructure are planned with the industrial and residential loads. The development integrates generation, distribution, treatment, reuse and maintenance with the operation of research buildings, production halls and homes.

Energy

Plan solar and other selected generation, distribution and energy-management systems against the park’s operating demand.

Water

Coordinate supply, treatment, process-water requirements, drainage and appropriate reuse.

Digital infrastructure

Connect laboratories, production equipment, transport, campus services and programme administration.

  1. Demand planning
  2. Infrastructure installation
  3. Building connections
  4. Integrated operation

Related construction milestones