Kinetic Fusion printing bridges and lifting systems assembling nanopowder-printed floors into bionic towers AVIS architectural and industrial vision

Print and construct

Print. Lift. Connect.

Printed building sections become architecture through a coordinated lifting and connection sequence. Each installed floor advances the structural, service and façade work packages together.

An engineered sequence from component to building

The installation team receives inspected printed sections in the required order. Lifting equipment positions each component, engineers verify its connections, and follow-on teams install glazing and building services in completed zones.

Position

Coordinate transport, lifting points and temporary support with the approved installation method.

Connect

Complete and inspect structural and service interfaces before the next installation stage.

Enclose

Add glazing, circulation, utilities and environmental systems as the completed structure progresses.

  1. Printed component
  2. Dimensional check
  3. Lift and position
  4. Connect and inspect
  5. Enclose